By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Stay Current on Political News—The US FutureStay Current on Political News—The US FutureStay Current on Political News—The US Future
  • Home
  • USA
  • World
  • Business
    • Realtor
    • CEO
    • Founder
    • Entrepreneur
    • Journalist
  • Sports
    • Athlete
    • Coach
    • Fitness trainer
    • Life Style
  • Education
  • Health
    • Doctor
    • Plastic surgeon
    • Beauty cosmetics
  • Politics
  • Technology
    • Space
    • Cryptocurrency
  • Weather
Reading: $52M move for safety, efficiency at Geraldton Port
Share
Font ResizerAa
Font ResizerAa
Stay Current on Political News—The US FutureStay Current on Political News—The US Future
  • Home
  • USA
  • World
  • Business
  • Cryptocurrency
  • Economy
  • Life Style
  • Health
  • Politics
  • Space
  • Sports
  • Technology
  • Weather
  • Entertainment
  • Cybersecurity
Search
  • Home
  • USA
  • World
  • Business
    • Realtor
    • CEO
    • Founder
    • Entrepreneur
    • Journalist
  • Sports
    • Athlete
    • Coach
    • Fitness trainer
    • Life Style
  • Education
  • Health
    • Doctor
    • Plastic surgeon
    • Beauty cosmetics
  • Politics
  • Technology
    • Space
    • Cryptocurrency
  • Weather
Follow US
Stay Current on Political News—The US Future > Blog > $52M move for safety, efficiency at Geraldton Port

$52M move for safety, efficiency at Geraldton Port

Usama Nisar
Usama Nisar
Published May 12, 2025
Share
Image: Adwo/stock.adobe.com

The WA Government has taken its first major step on the $350 million Geraldton Port Maximisation Project (PMaxP).

Construction has started on a $52 million materials handling facility at Geraldton Port, as part of plans to increase the port’s capacity, reduce dust emissions, and enhance safety and efficiency.

The new facility will streamline the loading process by moving mineral sands and other products directly from trucks to bulk vessels at Berth 4 using a fully enclosed conveyor system.

This design includes dust extraction systems to minimise emissions and a washdown water treatment system to recycle and reuse water.

According to Ports Minister Stephen Dawson, the facility will “improve safety, environmental and efficiency outcomes across the entire port”, while also supporting Western Australia’s growing export volumes in grain, iron ore, and minerals.

The PMaxP is a multi-stage initiative intended to boost export capabilities and future-proof Geraldton Port.

The next project in the pipeline is the proposed Surge Protection Breakwater, which is currently under assessment by the WA Environmental Protection Authority. The project is expected to mitigate wave action that currently disrupts port operations, costing an estimated 30 productive days each year.

The materials handling facility is scheduled for completion in late 2026.

WA’s Mid West Minister Jackie Jarvis says the project has serious potential for local job creation and economic growth, noting that it will “strengthen supply chains for the State’s important grain industry” and enable the export of new commodities.

 

 

Popular News
USA

Beware the most toxic traits of the bull

Sophia Martin
Sophia Martin
April 24, 2025
NYT's, MSNBC's Baker: Left Has Engaged in Violence, But Trump Seems 'More Willing' to Use Dangerous Rhetoric
Alijah Arenas crash video shows fiery wreck that led to USC commit being induced into coma
Cosmetic fillers are popular but come with risks. Here’s what to know from a dermatologist.
92 projects funded in NSW spree
Stay Current on Political News—The US Future
The USA Future offers real-time updates, expert analysis, and breaking stories on U.S. politics, culture, and current events.
  • USA
  • World
  • Politics
  • Education
  • Weather
  • Business
  • Entrepreneur
  • Founder
  • Journalist
  • Realtor
  • Health
  • Doctor
  • Beauty cosmetics
  • Plastic surgeon
  • Sports
  • Athlete
  • Coach
  • Fitness trainer
© 2017-2026 The USA Future . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?